30′ x 50′ x 14′ Steel Building Sale

Here are steps for buying a certified 30′ x 50′ x 14′ steel building for $1,000 above actual costs.

30 x 50 x 14 Metal Building Price

To buy only $1,000 above cost, select a building model and a preset framed opening configuration. It’s that simple!

  1. Select a Building Model and list on Order Form.
Metal Building 1:12
Standard 1:12
Key Feature:
  • Galvalume Plus Roof. 40-year colored walls and trim warranty.
I-Beam Metal Building
Standard 4:12
Key Features:
  • 4: 12 Roof Pitch. 40-year colored roof, walls, and trim warranty.
Deluxe Model Steel Building

Deluxe Model

Key Features

3:12 Pitch. 18″ Canopies and Purlins Extensions w/soffits. Colored Roof.

I-Beam Metal Building
Executive Model

Key Features
  • 3:12 Pitch. 2′ Canopies and Purling Extensions. w/soffits . 4′ Wainscot w/trim.

2. Select a Framed Opening Configuration and list on Order Form.

30x50x14 A1 4 12

Opening – Option $1

1- F/O located on 1st bay on front sidewall

30x50x14 B2 4 12

Opening – Option #2

2 – F/O located in 1st bay on the sidewall.

30x50x14 A2 opt2 2 12

Opening – Option #3

1- F/O located in center bay of both E/W.

30x50x14 B1 opt2 2 12

Opening – Option #4

1- F/O located in 2nd bay on front sidewall.

Building Codes: 5 lb. Roof Load | 110 Wind | Exposure B | IBC 2021

Key Specifications:

Our metal buildings are designed for durability, strength, and longevity, featuring:

  • Warranty Protection: Standard 4:12, Deluxe, and Executive models have a 40-year warranty on colored walls, trim, and the roof. The Standard 1:12 model has a 30-year Galvalume Plus roof finish.
  • Superior Construction: Solid I-beam construction with a clear-span design (no interior columns) for maximum usable space.
  • Structural Integrity: Lifetime structural warranty, ensuring long-term reliability.
  • High-Quality Materials:
    • 26-gauge sheeting with 80,000 p.s.i. tensile strength and a 1 1/4″ sheeting profile.
    • Purlin Bearing Rib (PBR) panels for enhanced overlap and strength.
    • Long-life roof fasteners color-matched to the building.
  • Complete Trim & Flashing: Includes a sculptured trim package and fully flashed framed openings.
  • Precision Engineering:
    • Pre-punched connecting clips for structural members (including endwall columns) are welded and primed during fabrication.
    • All structural elements for framed openings (jambs, girts, and headers) are pre-cut, pre-punched, and welded for easy assembly.
  • Additional Components: All bolts, screws, closures, weather stripping, sealants, and fasteners required for erection are included.
  • Industry Certification: Manufactured by an IAS-accredited and MBMA-member company.

Note: Another manufacturer provides anchor bolts and erection services.

A 30x50x14 I-beam building provides superior durability, flexibility in design, and quicker construction times compared to conventional structures. Its I-beam steel frame offers high resistance to environmental conditions, pests, and fire. The clear-span interior allows for versatile use of space without load-bearing walls. Additionally, its maintenance costs are lower, and it can be more energy-efficient, making it a cost-effective, long-term investment with significant advantages over traditional construction methods.

Order to Delivery Process

  1. Select Building Model.
  2. Choose F/O Configuration (opening fixed – can’t be changed).
  3. Fill out complete quote/order form.
  4. You will receive a wholesale quote that confirms savings, and pay the $1,000 brokerage fee on the same day.
  5. Pay a 30% building deposit to the certified IAS manufacturing plant within 5 days of order.
  6. Receive an Order Acknowledgement email/letter that indicates order #, plan completion date, and delivery date. Plans completed within 3 weeks. Building delivery within 8 to 10 weeks.
  7. You should receive a call from the shipping department to schedule an exact delivery date.
  8. Pay balances within 3 weeks before delivery. C.O.D. option must be preapproved.
  9. Have equipment (forklift) available to unload the structure when building arrives.
  10. Inventory and inspect material when it arrives. Then sign the bill of lading.

Steps To Saving On Steel Building Prices

We are in the process of building this page…Thank you for your patience

Standard I-Beam Steel Building Specifications

Free (Initial) Certified Building Plans for ALL 50 states.

  • Letter of Certification
  • 2 sets of certified stamped anchor bolt plans

PRIMARY FRAMING

(Mainframes)

SOLID I-BEAM CONSTRUCTION   Material used is 34,000 and 55,000 p.s.i. yield strength. (Some manufacturers use only 34,000 p.s.i. yield strength material).  Frames are single bead, continuous submerged arc welded by automatic welding machines to help ensure quality. A factory-applied rust inhibiting primer is used to help protect the mainframes and secondary material during the erection process.

ENDWALL FRAMES AND COLUMNS are either cold formed, hot-rolled or built-up “I” sections depending on design requirements.

SECONDARY FRAMING

GIRTS (in sidewall) and PURLINS (in roof) are minimum 8” to meet design requirements.  Cold rolled Z-section, 12 to 16 ga ASTM A-653, 55,000 p.s.i. yield material is used to provide maximum strength.

Bypass girt system overlaps at sidewall columns forming a continuous “span” for extra strength.  All girt clips are factory welded for easier erection.  

PURLINS are top-mounted on the rafter with a varied lap of 1’6” to 5’ for strength and cost savings in erection labor.  Maximum purlin spacing is 5’ on center.

EAVE STRUT is a cold-formed C-section that is rolled for the appropriate roof pitch to help insure weather tightness at the eave.

RAKE ANGLE is a 2×4 angle supplied for the attachment of the sheeting at the rake of the building for ease of installation.

BASE ANGLE is a 2×4 angle supplied for the attachment of the base of the sheeting to the concrete.  The base angle is to be attached to the concrete with ram-sets or equivalent anchors.

BRACING  All diagonal galvanized cable bracing is supplied for roof and walls to remove longitudinal load from the structure.  Galvanized cable is used rather than solid rod to prevent the bracing from “sagging” under its own weight and it is easier to install.  All cables are pre-stressed and pre made for easier erection.  

Angle Flange Bracing is provided for the connection of the rigid frame to the purlins and girts.  This ensures the allowable compressions are adequate for any combination of loading.

FRAMED OPENINGS have cold-formed C-section jambs and headers to help insure easy installation of overhead doors, etc.

SHEETING

 26 gage 80,000 P.S.I. yield strength material standard.  Some manufacturers use a lower yield strength material, which is less resistant to damage from hail or other impacts.

ALL COIL STEEL has a minimum of G-90 class Galvalume substrate (1.25oz hot dipped) to help           prevent deterioration of the steel sheeting.

DEEPER HIGH-RIB with more frequent corrugations provides extra strength.

OPTIONAL ARCHITECTURAL PANEL configuration is available for walls, mansard systems, soffit material, etc., to add an aesthetic appeal to your building.

FASTENERS

STRUCTURAL BOLTS meet requirements ASTM Standards.  A-325 for primary frame connections  A-307 for secondary framing

   

SELF-DRILLING AND SELF-TAPPING FASTENERS are pre-assembled with neoprene washers and metal caps to help insure weather tightness.

CLOSURES

CLOSED CELL NEOPRENE STRIPS are used to help seal building.   Located at eave, gable, and optional at the base of building to help provide weather tightness.  Pre-formed shapes to match panel configuration providing a tighter seal.

1-1/2” SHEETING NOTCH at base of concrete where panel site is designed into every building.  Sheeting notch provides an air infiltration stop on blanket insulated building.

SEALANTS

SEALANT for roof sidelaps, endlaps and flashing at gable is provided to help insure weather tightness.  Nominal 3/8” x 1/8” thick pressure sensitive tape sealant for ease of installation.

RIDGE CAP

LONG OVERLAP to help prevent water from siphoning into building.

 

TRIM AND FLASHING

All buildings are fully trimmed at rake (gable), corners, and eaves with standard trim material for a more finished look.  This not only improves look of building, it is an additional deterrent to moisture, insects, and dirt from getting into the building.

PLANS AND DRAWINGS

ANCHOR BOLT setting plan, building reactions for foundation design, Erection Manual, and Engineer  Letter of Certification is provided shortly after receipt of deposit for building.

ERECTION DRAWINGS provide step-by-step instructions for the case of assembly by dealer or customer.

ENGINEER CERTIFIED APPROVAL DRAWINGS including wall and roof framing diagrams, cross  sections, sheeting, and flashing details are provided.  These drawings clearly show the proper erection and assembly of all building components.

ALL PARTS ARE NUMBERED  Part number is placed on each component (not including sheeting,  screws, etc.).  These part numbers coincide with a detailed listing contained in the bill of materials that comes with your building.  The same numbers are also used on the drawings for clarity and to help with assembly on the job site.

For more details, click Specifications  

Metal Building Colors, Trim Colors, and Roll Up Door Colors

You will list your colors on the Predesign Building Quote-Order Form.

The building colors have a 40-year warranty. Galvalume Plus color has a 30-year warranty.

***Roll Up Door colors are posted below WALL and TRIM color swatches.***

Charcoal Gray steel building color
Charcoal Gray
Ash Gray steel building color
Ash Gray
Desert Sand steel building color
Desert Sand
Fern Green steel building color
Fern Green
Hawaiian Blue steel building color
Hawaiian Blue
Light Stone steel building color
Light Stone
solar white steel building color
Solar White
Rustic Red
Rustic Red
Burnished Slate steel building color
Burnished Slate
Cobalt Blue steel building color
Cobalt Blue
Crimson Red steel building color
Crimson Red
Galvalume Plus steel building color
Galvalume Plus
Polar White steel building color
Polar White
Koko Brown steel building color
Koko Brown
Saddle Tan steel building colors
Saddle Tan

ROLL UP DOORS 

Screen Shot 2022 07 27 at 1.42.43 PM

Stay informed if steel building prices are reduced or increased!

Name(Required)
You can easily unsubscribe.